Seagate ST31230N/ND Guia de Instalação Página 264

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 263
Index-2
Standard 1.0 Option 11 EC Installation and Maintenance Guide November 1999
D
Data loss and disk replacement,
17-7
Data port
internal connections
,
8-4
usage
,
8-3
dataport locations
assigning the
,
13-18
defining
Meridian Mail in the customer data block
,
12-3
the Meridian Mail DNs on the Option 11 switch
,
10-12
the virtual ACD agent
,
10-9
defining voice port hardware locations,
13-14
description, power supply,
5-3
Determining the number of MGate cards needed,
9-6
diagnosing
utility card faults
,
14-22
VP card faults
,
14-23
Disk
Maintenance screen field descriptions
,
16-14
Pair Status screen field descriptions
,
16-14
positions
,
6-3
disk drives
assembling and installing
,
6-3
supported
,
6-3
disk shadowing
enabling/disabling
,
16-13
overview
,
16-9
disk subsystem
checking
,
14-20
common problems
,
17-1
disk unit
replacing on a shadowed EC 11
,
16-9
replacing on an unshadowed EC 11
,
16-7
documents,reference,
2-3
DSP parameters
entering
,
13-13
E
EC 11
assembly overview
,
3-1
cabinet layout
,
1-10
cabling
,
8-3
defining voice port hardware locations
,
13-14
hardware configuration
,
1-8
hardware features
,
1-8
printed circuit packs
,
7-3
EC 11 system software,
1-5
Enabling/disabling disk shadowing,
16-13
entering DSP parameters,
13-13
Entering overlays,
10-3
,
11-3
entering the serial number and keycode,
13-5
entering your customer name,
13-8
environment, tape drive,
16-16
equipment
inspecting
,
4-5
unpacking
,
4-3
external alarms, connecting,
8-38
external tape drive, installing,
6-12
G
GAC, installing,
8-31
H
hardware
configuration, EC 11
,
1-8
features, EC 11
,
1-8
maintenance
,
16-1
hexadecimal display, reading,
14-4
Hospitality Voice Services software, Meridian 1,
1-6
I
Identifying disk problems through SEERs,
17-5
Inserting and removing a tape
in the Archive drive
,
6-15
in the Tandberg drive
,
6-14
Inspecting the equipment,
4-5
Install
the disk drives and the tape drive
,
6-1
the EC 11 to Meridian 1 Option 11 switch
interface
,
9-1
the power supply
,
5-1
installation
order of
,
3-3
preparing for
,
2-1
requirements
,
2-3
summary
,
3-3
Vista de página 263

Comentários a estes Manuais

Sem comentários