Installing the EC 11 to Meridian 1 Option 11 switch interface 9-3
Overview of typical cabling
Standard 1.0 Option 11 EC Installation and Maintenance Guide November 1999
Overview of typical cabling
Installing the AML
cable and SDI/DCH
card
This section describes the AML cabling between an EC 11
and an Option 11 switch. Use this section as a “quick start”
guide only. Details are explained in the remainder of this
chapter.
To install the AML cable and SDI/DCH card, follow these
steps.
Step Action
1 Configure the SDI/DCH card (NTAK02) as follows to
use port 1 as ESDI:
a. Set the DIP switch 1-1 on, 1-2 on (on=up).
b. Configure the jumpers in positions J6, J7,
J8, J9 from B to A. (Each jumper covers
eight pin positions.) The remaining switch
positions and jumpers have no effect on
port 1.
2 Install the SDI/DCH card into a vacant slot in the
Option 11 switch, other than slot 2, 6, or 10. Also, do
not use slot MM2 or MM3, which are to the right of
slot 10. In this example, we use slot 1.
3 Plug a 4-port fanout cable (NTAK19FB) into
connector J1 (which corresponds with slot 1) on the
Option 11 switch.
4 Plug the Port 1 lead of this cable to the AML
connector on the EC 11. If necessary, use a straight-
through RS-232 cable (NTND91AA/AB) and a
gender changer (A0351509) to extend the cable.