Seagate ST43401N/ND Guia de Instalação Página 137

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 146
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 136
APPENDIX B Sample Migration Task Lists
129
3 Alter the
sybsystemprocs database.
4 Perform a pre-upgrade verification.
5 Upgrade the production system to Release 12.5.
6Run
dbcc commands (checktable, checkalloc, checkcatalog) on the
Release 12.5 databases. Be sure to verify the
dbcc log and error log.
7 “Baseline” the Release 12.5 configuration on the production system.
8 Perform user testing and verification.
Perform Final Steps
1 Start production users on the Release 12.5 production system.
2 Upgrade the test system to Release 12.5.
Staged Cutover Task Overview
This sample task overview covers a staged cutover migration approach to
rebuild Adaptive Server. The scenario for this task list is:
The large company has a mature client/server environment with
multiple applications residing on a single server.
In the event of failure, the company depends on nightly backups and
transactions dumps. The system cannot be down more than one hour
and cannot afford more than two hours of data loss.
The environment includes development, test, and production
platforms. It requires enough space for duplicate servers on each
platform.
The object-level rebuild strategy necessitates moving the data, which
requires system downtime for the target application.
Tasks
The high-level tasks in this scenario are:
Vista de página 136
1 2 ... 132 133 134 135 136 137 138 139 140 141 142 ... 145 146

Comentários a estes Manuais

Sem comentários