Seagate ST3390N Guia de Instalação Página 126

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 125
10-4 Installing, cabling, and configuring peripheral devices
Installation overview
Standard 1.0 Modular Option EC Installation and Maintenance Guide November 1999
Installing the A/B
switchbox
You need the A/B switchbox to permit remote support by Nortel
Networks. See “A/B switchbox for remote administration and
maintenance” on page 10-5.
To install the A/B switchbox, follow these steps.
Step Action
1 Place the A/B switchbox in a suitable location within 4.5 m
(15 ft.) of Meridian Mail.
Although the switchbox may not be exactly as indicated in this
document, the installation is the same. See the instructions
provided with the switchbox for specific details.
2 Set the switch on the front of the A/B switchbox to the “A”
position.
a. Label the A switch position “local.”
b. Label the other position “remote.”
Vista de página 125
1 2 ... 121 122 123 124 125 126 127 128 129 130 131 ... 467 468

Comentários a estes Manuais

Sem comentários