Migrating to Sybase Adaptive Server Enterprise 11.5 4-3
Adaptive Server Enterprise 11.5 Determine Migration Approach
Note
This migration guide does not cover other parallel migration approaches;
such as, running two systems in parallel where you have to maintain both
the systems simultaneously, or transaction duplication where you use one
front-end to drive two parallel back-ends. These system operational
approaches include factors too site-specific to detail effectively in this guide.
Whenever possible, upgrade test and development databases release
11.5 first. Upgrade the production system after testing. See Chapter 7,
“Test: Ensuring Stability and Performance” for more information about
testing.
Parallel With Replication
The issues for the parallel (with replication) approach are described
in Table 4-2: Parallel migration:
Table 4-2: Parallel migration
Issue Recommendations and Tips
Method Install a new copy of Adaptive Server 11.5
Copy in or load pre-release 11.5 databases t
Use Replication Server to maintain both sets of databases. The release 11.x
system becomes the primary server, and you maintain the pre-release 11.x
system as a warm standby.