Seagate ST43401N/ND Informações Técnicas Página 151

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 172
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 150
Migrating to Sybase Adaptive Server Enterprise 11.5 D-7
Adaptive Server Enterprise 11.5 General Migration Task List Example
4. Configure applications to access new server.
5. Perform preliminary tuning.
6. Allow user access to system and server.
7. Insure no access to obsolete files.
8. Notify users of availability.
Migration Quality Assurance
Perform System Tests
1. Perform functional tests.
2. Compare functional test results to baseline.
3. Analyze functional test results.
4. Perform corrective actions.
5. Retest as necessary.
6. Document functional test results.
7. Obtain user signoff on functional test results.
Perform Integration Tests
1. Perform integration tests.
2. Compare integration test results to baseline.
3. Analyze integration test results.
4. Perform corrective actions.
5. Retest as necessary.
6. Document integration test results.
7. Obtain user signoff on integration test results.
Perform Stress Tests
1. Perform performance/capacity tests.
2. Compare capacity test results to baseline.
3. Analyze capacity test results.
4. Perform corrective actions.
Vista de página 150
1 2 ... 146 147 148 149 150 151 152 153 154 155 156 ... 171 172

Comentários a estes Manuais

Sem comentários